Shell and core building in up to two weeks!
BERGER Házak Zrt. manufactures and builds large-panel, environment-friendly prefabricated houses also for public customers in high quality, under controlled factory conditions, using natural raw materials. From design to construction, we work according to our customers’ needs, with guaranteed prices and deadlines. Our expertise, enthusiasm and customer-centred approach ensure that with Berger Házak the entire design and construction process is predictable and transparent.
Our services include the construction of high-quality, environmentally friendly and energy-saving public buildings designed and manufactured specifically for our public customers. We have our own building and construction teams, and we employ highly skilled and recognized subcontractors for specialist works to ensure maximum quality.
Our process
BERGER Házak Zrt. manufactures and builds energy-saving, quickly completed, environment-friendly buildings in high quality, as per design, and without any complications. The entire process is handled by our colleagues in accordance with the customer’s expectations, with a guaranteed deadline and commitment price when signing the contract.
Why us?
Our technology is based on Weinmann’s computer-controlled system, the world’s largest manufacturer of CNC-controlled machining units, thus making us a unique plant in Hungary in terms of both quality and production capacity.
A priority for us
Our projects
DEBRECEN UNIVERSITY CENTRE FOR INNOVATION AND TECHNOLOGY
Details
As a result of the project, a total of 910 visible quality laminated beams were embedded in the three-dimensional steel frame structure, the length of each structural element exceeding 22 metres and their height more than 65 centimetres. A total of 4,700 square metres of CLT floor panel structure was surface treated and installed as an intermediate as well as a locking slab. The four intersecting and superimposed beam levels were built in less than 20 days. It took 10 days to place and install the CLT panels.
FOOTBALL ACADEMY, SPORTS HOTEL
Details
The special feature of the building lies in the nearly 1,000 square metres of CLT intermediate slab and the 1,450 square metres of roof structure made using a nail board solution. The obtaining of its building permit is still in progress, together with the final detailed design preparedness.
Berger Házak Zrt. currently has a contract with the Investor in the first phase up to a degree of completion of the shell and core stage. Production and on-site assembly of the structural elements will begin soon, and the shell and core stage handover of the building will take two and a half months from the start date.