Degrees of completion |
Shell and core includes |
Completed from the outside includes |
Turnkey house includes |
---|---|---|---|
General, preliminary customer tasks at the planning stage (non-BERGER commitment) | |||
geodetic survey of a plot with a surveyor | |||
preparation of soil mechanics expert opinion | |||
1 copy of the certificate of authenticity of the property | |||
1 copy of the certified map of the property | |||
Planning | |||
CAD product designs | |||
model house master plan adaptation package for simple notification | |||
Building structures | |||
Public utility construction outside the building with planning up to the plot boundary, up to a distance of 20 meters from the building (water, electricity, sewage) | |||
Reception level with general technical content (base body, plinth wall, reinforced base, insulation against soil vapor and soil moisture) | Optional | Optional | Optional |
Wall structure (external, internal) | |||
Ceiling structure (with insulation) | |||
Roof structure | |||
Edging and covering of roof elongations with final surface formation | |||
Roof underlayment | |||
Roofing | |||
Gutter | |||
Exterior doors and windows | |||
Külső párkány | |||
Belső könyöklő | |||
Complete external heat-insulated facade formation (plastered or wood cladding) with final surface formation | |||
Ceiling fireproof plasterboard | |||
Preparation of basic electrical installations in prefabricated structures | |||
Design of mechanical installation sites for walls | |||
Balcony railing, balcony walking area | |||
Interior stairs and railings | |||
Electrical installations with fittings but without consumer units installed | |||
Heating installation commissioned | |||
Mains-connected solar system | |||
Wiring of sanitary ware | |||
Interior plastering, painting, wallpapering | |||
Substrate insulation, concreting | |||
Cold/warm tiling (wall, floor) | |||
Interior doors | |||
Delivery, craneing and complete assembly of the listed structures and materials together with the scaffold and all the aids necessary for assembly | |||
Unpredictable costs required | |||
entrance permits, land reservation costs | |||
providing a shorter transport vehicle for hard-to-reach plots and the additional cost of this |